제품 상세 정보:
결제 및 배송 조건:
|
기술: | PA66 나일론 버스바 플러그 | 색: | 백색 |
---|---|---|---|
모델: | KD-05/15, KD-03/13, KDK-19, KDK-22 | 재료: | PA66 |
발언: | 4P 5P | 용법: | 버스바를 위해 사용됩니다 |
하이 라이트: | Unit,68mm 바스덕트 퇴임하는 덮개에서 떨어져 있는 PA66 바스덕트 퇴임하는 Sheath,76mm 버스바 도청 |
Busduct Outgoing Sheath for Busbar Tap Off Unit for Conversion
Its used for the prevent the dust and Sundries entering the tap off unite
Model | Hole Diameter | Max. Diameter for Wire |
KD-KT4 | φ76mm | φ68mm |
KD-KT3 | φ66mm | φ54mm |
Installation Guideline of Tap Off Unit (Plug-In Type)
There are two types of plug-in tap-off units :
1) Plug-in tap-off units without automatic clamping system .
2) Plug-in tap-off units with automatic clamping system.
Step 1: Open or remove the tap-off unit cover.
Step 2: Install the protection device in the tap-off unit.
Step 3: Remove the IP protection on the outlet of the run component.
Step 4: Prepare the output cable glands and connect the cables to the tap-off unit.
Step 5: Check that the protection device is switched off and carefully inspect the tap-off unit for tools and objects that may have been left inside the tap-off unit.
Step 6: Position the rear of the tap-off unit on the run component.
Step 7: Plug the tap-off unit into the run component.
Step8: Lock the tap-off unit on the run component using the locking handle located inside the tap-off unit
Step9: Secure the tap-off unit on the run component using the fixing mechanism.
Step10: Close the tap-off unit cover. The system and the load are ready to be energized.
담당자: Tina
전화 번호: +8618115561910
팩스: 86-512-62761477-807